Guidelines for the Operation of Medical Wastewater

Guidelines for the Operation of Medical Wastewater Treatment Process Plan

The relevant medical wastewater of first - and second level hospitals such as urban health centers and county level hospitals mainly consists of domestic sewage, bed surgeries, and laboratory tests. Blue One Environmental Protection Company has integrated the relevant process solutions of the medical wastewater treatment industry and adopted the long-range Blue One Intelligent Control System to ma

    The relevant medical wastewater of first - and second level hospitals such as urban health centers and county level hospitals mainly consists of domestic sewage, bed surgeries, and laboratory tests. Blue One Environmental Protection Company has integrated the relevant process solutions of the medical wastewater treatment industry and adopted the long-range Blue One Intelligent Control System to make the operation of the medical wastewater treatment system more stable and greatly enhance the purification effect of wastewater treatment.


    process flow
    After the sewage is collected through pipelines, it first flows into the regulating tank through mechanical grilles to remove soft entanglements, large solid particles, and floating objects in the sewage, thereby protecting the service life of subsequent water pumps and reducing the workload of system treatment. The grid well is a brick concrete structure, and this process uses mechanical grids with a spacing of 5mm between grids.
    After being treated by mechanical grilles, the sewage enters the regulating tank for the regulation and homogenization of water quantity and quality, ensuring the balance and stability of organic matter concentration in the subsequent biochemical treatment system. A pre aeration system is also installed for oxygenation and stirring to prevent the accumulation of particulate matter in the sewage due to long-term sedimentation, which also has a certain degradation effect on organic matter in the sewage and improves the pre-treatment capacity of the entire system.
    A lift pump is installed in the regulating tank to lift the uniformly treated sewage to the anaerobic tank for treatment. The regulating pool adopts automatic control of floating ball liquid level. When the water level reaches the required level, the lifting pump works automatically. The floating ball liquid level adopts high opening and low stopping, and is intelligently controlled by PLC electronic control.
Due to the high content of organic nitrogen and compounds in sewage, they will appear in the form of ammonia nitrogen during biodegradation. Therefore, the indicators of ammonia nitrogen discharged into water will increase, and ammonia nitrogen is also a pollution control indicator. Therefore, an anaerobic tank is added before the contact oxidation tank. The anaerobic tank can utilize the nitrate brought in by the reflux mixture and the organic carbon source in the influent for denitrification, reducing NO2- and NO3- in the influent to N2 to achieve denitrification. Degradation of ammonia nitrogen while removing organic matter, equipped with efficient bio elastic packing and hydrolysis acidification function. The anaerobic tank decomposes difficult to degrade large molecules in organic matter into easily degradable small molecules, providing favorable conditions for subsequent biochemical processes;
    The contact oxidation tank is the core part of this sewage treatment, divided into two stages: anaerobic and aerobic. In the first stage, under high organic load, a large number of microbial communities of different species attached to the packing participate in biochemical degradation and adsorption, removing various organic substances from the sewage and significantly reducing the organic content in the sewage. In the later stage, under low organic load conditions, the action of nitrifying bacteria degrades ammonia nitrogen in sewage under sufficient oxygen conditions, while also reducing the COD value in sewage to a lower level, thus purifying the sewage. The pool consists of a pool body, packing material, water distribution device, and oxygenation and aeration system.
    The biological contact oxidation method is mainly based on biofilm method, and also has the characteristics of activated sludge method: (1) it has a higher biomass per unit volume than activated sludge method, resulting in higher organic load, shorter contact time, and higher treatment efficiency, which is conducive to reducing the volume of treatment structures, reducing land occupation, and saving infrastructure investment. (2) Sludge does not need to be refluxed, there will be no sludge expansion, and the operation and management are simple. (3) The system has strong impact load capacity, and this method has strong adaptability to load changes due to the growth of a large number of biofilms on the packing. It also has certain effectiveness under intermittent operating conditions, making it more practical for pharmaceutical wastewater with uneven drainage. (4) Hanging film cultivation is simple. It usually takes 7-15 days to hang the film, and after about 20 days of domestication, it can be put into operation. The filling material in the pool adopts elastic three-dimensional composite filling material, which has a large specific surface area and a long service life,
    Easy to hang film, corrosion-resistant, and does not clump or block. The filling material can freely stretch in the water, cutting the bubbles in multiple layers, which relatively increases the aeration effect;
    The pool is divided into two stages to degrade water quality into gradients, achieving good treatment effects. At the same time, corresponding diversion and turbulence measures are designed to make the overall design more rational.
    The aeration pipeline in the pool is made of good national standard materials, which are corrosion-resistant. The aerator uses a 215 rotary mixer aerator, which is not blocked and has a high oxygen utilization rate;
  • Telephone:0371-88912366 0371-88912399

  • Service Hotline:4006096637(technology)

  • Address:Unit 303, Building 5, Zhangwuzhai No.2 Courtyard, Sequoia Road, Zhengzhou High tech Zone, Henan Province

  • Add WeChat

Copyright Notice: The content published on this website may not be downloaded, reproduced or mirrored without the permission of this website and the author. Violators will be held legally responsible by this website.
国产精品久久久久久久久久妞妞| 人妻夜夜爽天天爽三区麻豆av网站| 欧美亚洲国产一区二区三区| 久久无码人妻精品一区二区三区| 人人妻人人澡人人爽人人精品浪潮| 精品日产卡一卡二卡麻豆| 夜夜躁狠狠躁日日躁| 性裸交a片一区二区三区| 亚洲av婷婷五月产av中文| 免费观看性欧美大片无片| 黄瓜视频在线观看网址| 日本乱子人伦在线视频| 一二三四在线观看免费视频| 毛茸茸性xxxx毛茸茸毛茸茸| 丰满人妻一区二区三区无码av| 亚洲日韩av无码中文字幕美国| 99久久无色码中文字幕| 欧美亚洲日韩国产人成在线播放| 性欧美大战久久久久久久| 国产后入又长又硬| 国产精品日本一区二区在线播放| 精品日韩欧美一区二区在线播放| 亚洲av无码之国产精品网址蜜芽| 18禁裸男晨勃露j毛免费观看| 亚洲精品久久| 国产精品99久久久久久www| 国产无套粉嫩白浆在线观看| 大桥久未无码吹潮在线观看| 精品国产一区二区三区av性色| 国产欧美精品aaaaaa片| 五月丁香六月激情综合在线视频| 亚洲成a∨人片在线观看不卡| 亚洲av无码专区国产乱码4| 中文天堂网www新版资源在线| 久久精品国产亚洲av蜜臀色欲| 亚洲精品高清无码视频| 亚洲午夜精品久久久久久浪潮| 特黄a级毛片免费视频| 国精产品一区一区三区有限在线| 国产精品扒开腿做爽爽爽a片唱戏| 国产亚洲精品成人aa片新蒲金|